ZetCode

Modula-2 unit testing

last modified November 27, 2026 Modula-2

A unit test calls a procedure with known arguments and compares the result with the value it should have. Neither PIM nor ISO Modula-2 comes with a testing library, and none is needed: a few procedures that count the passed and failed checks are enough, and the exit status from the environment and processes article tells the shell or make whether everything passed.

The article tests a small Dates module whose first version has a bug, and later the Text and Numbers modules from earlier articles. All examples are compiled with -fiso.

A first test

The module under test answers two questions about the calendar: whether a year is a leap year and how many days a month has.

Dates.def
DEFINITION MODULE Dates;

PROCEDURE IsLeap(year: CARDINAL): BOOLEAN;
PROCEDURE DaysIn(month, year: CARDINAL): CARDINAL;

END Dates.
Dates.mod
IMPLEMENTATION MODULE Dates;

PROCEDURE IsLeap(year: CARDINAL): BOOLEAN;
BEGIN
  RETURN year MOD 4 = 0
END IsLeap;

PROCEDURE DaysIn(month, year: CARDINAL): CARDINAL;
BEGIN
  CASE month OF
    2: IF IsLeap(year) THEN RETURN 29 ELSE RETURN 28 END
  | 4, 6, 9, 11: RETURN 30
  ELSE
    RETURN 31
  END
END DaysIn;

END Dates.

IsLeap treats every fourth year as a leap year, and DaysIn uses it for February. A test program imports the module like any other client.

first.mod
MODULE first;
FROM STextIO IMPORT WriteString, WriteLn;
FROM Dates IMPORT IsLeap;

BEGIN
  IF IsLeap(2024) THEN
    WriteString("pass: 2024 is a leap year")
  ELSE
    WriteString("FAIL: 2024 is a leap year")
  END;
  WriteLn
END first.

The test calls IsLeap with a year whose answer is known and prints pass or FAIL. A test describes what it checks, so that a failure message says what went wrong without a look at the source.

$ gm2 -fiso -c Dates.mod
$ gm2 -fiso first.mod Dates.o -o first
$ ./first
pass: 2024 is a leap year

Counting passes and failures

One IF per test does not scale. A procedure that takes the description and the result of the check keeps each test to one line and counts the results.

counting.mod
MODULE counting;
FROM STextIO IMPORT WriteString, WriteLn;
FROM SWholeIO IMPORT WriteCard;
FROM Dates IMPORT IsLeap;

VAR
  passed, failed: CARDINAL;

PROCEDURE Check(name: ARRAY OF CHAR; ok: BOOLEAN);
BEGIN
  IF ok THEN
    INC(passed)
  ELSE
    INC(failed);
    WriteString("FAIL: "); WriteString(name); WriteLn
  END
END Check;

BEGIN
  passed := 0;
  failed := 0;
  Check("2024 is a leap year", IsLeap(2024));
  Check("2023 is not a leap year", NOT IsLeap(2023));
  Check("2000 is a leap year", IsLeap(2000));
  Check("1900 is not a leap year", NOT IsLeap(1900));
  Check("2100 is not a leap year", NOT IsLeap(2100));
  WriteCard(passed, 0); WriteString(" passed, ");
  WriteCard(failed, 0); WriteString(" failed"); WriteLn
END counting.

Check stays quiet for a passed test and prints the description of a failed one, so that failures stand out. The summary counts both. Two tests fail: years divisible by 100 are leap years only when they are also divisible by 400, which IsLeap ignores. The tests that pass are needed too, because a fix for the failing ones must not break them.

$ gm2 -fiso counting.mod Dates.o -o counting
$ ./counting
FAIL: 1900 is not a leap year
FAIL: 2100 is not a leap year
3 passed, 2 failed

Expected and actual values

A failed Check reports only that a condition was false. When the result is a number, the test can compare it with the expected value itself and print both.

expected.mod
MODULE expected;
FROM STextIO IMPORT WriteString, WriteLn;
FROM SWholeIO IMPORT WriteCard;
FROM Dates IMPORT DaysIn;

VAR
  passed, failed: CARDINAL;

PROCEDURE CheckCard(name: ARRAY OF CHAR; actual, wanted: CARDINAL);
BEGIN
  IF actual = wanted THEN
    INC(passed)
  ELSE
    INC(failed);
    WriteString("FAIL: "); WriteString(name);
    WriteString(": expected "); WriteCard(wanted, 0);
    WriteString(", got "); WriteCard(actual, 0); WriteLn
  END
END CheckCard;

BEGIN
  passed := 0;
  failed := 0;
  CheckCard("January", DaysIn(1, 2023), 31);
  CheckCard("April", DaysIn(4, 2023), 30);
  CheckCard("February 2023", DaysIn(2, 2023), 28);
  CheckCard("February 2024", DaysIn(2, 2024), 29);
  CheckCard("February 1900", DaysIn(2, 1900), 28);
  CheckCard("December", DaysIn(12, 2023), 31);
  WriteCard(passed, 0); WriteString(" passed, ");
  WriteCard(failed, 0); WriteString(" failed"); WriteLn
END expected.

CheckCard takes the actual value first and the expected one second, and on a mismatch prints both. The message for February 1900 shows that DaysIn returns 29 instead of 28; the bug in IsLeap shows up in the procedure that uses it.

$ gm2 -fiso expected.mod Dates.o -o expected
$ ./expected
FAIL: February 1900: expected 28, got 29
5 passed, 1 failed

The exit status

The programs so far end with status 0 even when tests fail, so a script cannot tell success from failure without reading the output. The test program datestest is the previous program with three more lines at the end of its body.

datestest.mod
BEGIN
  passed := 0;
  failed := 0;
  CheckCard("January", DaysIn(1, 2023), 31);
  CheckCard("April", DaysIn(4, 2023), 30);
  CheckCard("February 2023", DaysIn(2, 2023), 28);
  CheckCard("February 2024", DaysIn(2, 2024), 29);
  CheckCard("February 1900", DaysIn(2, 1900), 28);
  CheckCard("December", DaysIn(12, 2023), 31);
  WriteCard(passed, 0); WriteString(" passed, ");
  WriteCard(failed, 0); WriteString(" failed"); WriteLn;
  IF failed > 0 THEN
    HALT(1)
  END
END datestest.

HALT(1) ends the program with status 1 when a test has failed. The shell operator && runs the second command only after a successful first one, so the message is not printed. Build scripts and continuous integration servers work the same way: a non-zero status stops the build.

$ gm2 -fiso datestest.mod Dates.o -o datestest
$ ./datestest
FAIL: February 1900: expected 28, got 29
5 passed, 1 failed
$ echo $?
1
$ ./datestest && echo "ready to release"
FAIL: February 1900: expected 28, got 29
5 passed, 1 failed

Fixing the bug

With the tests in place, the fix can be checked at once. A year is a leap year when it is divisible by 4, except for years divisible by 100 that are not divisible by 400.

Dates.mod
PROCEDURE IsLeap(year: CARDINAL): BOOLEAN;
BEGIN
  RETURN (year MOD 4 = 0) AND
         ((year MOD 100 # 0) OR (year MOD 400 = 0))
END IsLeap;

Only IsLeap changes. The implementation module is compiled again, the test program linked with the new object file, and all six tests pass; the status is 0. The definition module did not change, so the clients do not have to be recompiled.

$ gm2 -fiso -c Dates.mod
$ gm2 -fiso datestest.mod Dates.o -o datestest
$ ./datestest
6 passed, 0 failed
$ echo $?
0
$ ./datestest && echo "ready to release"
6 passed, 0 failed
ready to release

A test module

Every test program needs the counters, the check procedures and the summary. They belong in a module of their own.

Tests.def
DEFINITION MODULE Tests;

PROCEDURE Check(name: ARRAY OF CHAR; ok: BOOLEAN);
PROCEDURE CheckInt(name: ARRAY OF CHAR; actual, wanted: INTEGER);
PROCEDURE CheckStr(name, actual, wanted: ARRAY OF CHAR);
PROCEDURE Finish;

END Tests.

The module exports a check for a condition, for integers and for strings, and Finish, which prints the summary and sets the exit status. The counters stay hidden in the implementation.

Tests.mod
IMPLEMENTATION MODULE Tests;
FROM STextIO IMPORT WriteString, WriteLn;
FROM SWholeIO IMPORT WriteInt, WriteCard;
FROM Strings IMPORT Equal;

VAR
  passed, failed: CARDINAL;

PROCEDURE Fail(name: ARRAY OF CHAR);
BEGIN
  INC(failed);
  WriteString("FAIL: "); WriteString(name)
END Fail;

PROCEDURE Check(name: ARRAY OF CHAR; ok: BOOLEAN);
BEGIN
  IF ok THEN INC(passed) ELSE Fail(name); WriteLn END
END Check;

PROCEDURE CheckInt(name: ARRAY OF CHAR; actual, wanted: INTEGER);
BEGIN
  IF actual = wanted THEN
    INC(passed)
  ELSE
    Fail(name);
    WriteString(": expected "); WriteInt(wanted, 0);
    WriteString(", got "); WriteInt(actual, 0); WriteLn
  END
END CheckInt;

PROCEDURE CheckStr(name, actual, wanted: ARRAY OF CHAR);
BEGIN
  IF Equal(actual, wanted) THEN
    INC(passed)
  ELSE
    Fail(name);
    WriteString(': expected "'); WriteString(wanted);
    WriteString('", got "'); WriteString(actual); WriteString('"'); WriteLn
  END
END CheckStr;

PROCEDURE Finish;
BEGIN
  WriteCard(passed, 0); WriteString(" passed, ");
  WriteCard(failed, 0); WriteString(" failed"); WriteLn;
  IF failed > 0 THEN
    HALT(1)
  END
END Finish;

BEGIN
  passed := 0;
  failed := 0
END Tests.

Fail counts a failure and starts its message; each check adds its own details. CheckStr compares with Equal from the ISO Strings module and puts quotes around the strings, so that leading and trailing spaces are visible. The module body sets the counters before the test program starts.

texttest.mod
MODULE texttest;
FROM Tests IMPORT Check, CheckInt, CheckStr, Finish;
FROM Text IMPORT Field, Trim, Split;

VAR
  s: ARRAY [0..31] OF CHAR;
  f: ARRAY [0..3] OF Field;
  n: CARDINAL;

BEGIN
  s := "  padded  ";
  Trim(s);
  CheckStr("Trim both ends", s, "padded");
  s := "   ";
  Trim(s);
  CheckStr("Trim blanks only", s, "");
  Split("Bratislava, 475000, SK", ',', f, n);
  CheckInt("Split count", n, 3);
  CheckStr("Split first", f[0], "Bratislava");
  CheckStr("Split last", f[2], "SK");
  Split("a,,b", ',', f, n);
  Check("Split keeps empty field", (n = 3) AND (f[1][0] = 0C));
  Finish
END texttest.

The test program checks Trim and Split from the Text module of the string processing article, including the edge cases: a string of blanks only and an empty field between two separators. With the helpers in a module, a test program contains nothing but tests.

$ gm2 -fiso -c Tests.mod
$ gm2 -fiso -c Text.mod
$ gm2 -fiso texttest.mod Tests.o Text.o -o texttest
$ ./texttest
6 passed, 0 failed

Table-driven tests

Many tests of one procedure differ only in their data. A table-driven test writes the test logic once and lists the cases as rows. Here each row is one call of a small procedure; the procedure under test is ToInt from the Numbers module of the reading input article.

numberstest.mod
MODULE numberstest;
FROM Tests IMPORT Check, CheckInt, Finish;
FROM Numbers IMPORT ToInt;

PROCEDURE Good(input: ARRAY OF CHAR; wanted: INTEGER);
VAR
  n: INTEGER;
BEGIN
  IF ToInt(input, n) THEN
    CheckInt(input, n, wanted)
  ELSE
    Check(input, FALSE)
  END
END Good;

PROCEDURE Bad(input: ARRAY OF CHAR);
VAR
  n: INTEGER;
BEGIN
  Check(input, NOT ToInt(input, n))
END Bad;

BEGIN
  Good("42", 42);
  Good("-17", -17);
  Good("+5", 5);
  Good("  8  ", 8);
  Good("0", 0);
  Good("2147483647", MAX(INTEGER));
  Good("-2147483648", MIN(INTEGER));
  Bad("");
  Bad("abc");
  Bad("8x");
  Bad("1 2");
  Bad("-");
  Bad("2147483648");
  Finish
END numberstest.

Good expects the input to convert to the given value, and Bad expects the conversion to fail. The input doubles as the name of the test. Adding a case takes one line, which makes it easy to try the limits, and the limits find a bug: ToInt rejects -2147483648, the smallest INTEGER. It builds the number as a positive value and negates it at the end, and 2147483648 does not fit into an INTEGER. The other articles never read such a number, so the bug stays, and the failing test documents it.

$ gm2 -fiso -c Numbers.mod
$ gm2 -fiso numberstest.mod Tests.o Numbers.o -o numberstest
$ ./numberstest
FAIL: -2147483648
12 passed, 1 failed
$ echo $?
1

Testing for an exception

An error case is part of the behaviour of a procedure and deserves a test too. The final version of DaysIn raises an exception with the EXCEPTIONS module, as shown in the error handling article, when the month does not exist.

Dates.mod
PROCEDURE DaysIn(month, year: CARDINAL): CARDINAL;
BEGIN
  CASE month OF
    2: IF IsLeap(year) THEN RETURN 29 ELSE RETURN 28 END
  | 4, 6, 9, 11: RETURN 30
  | 1, 3, 5, 7, 8, 10, 12: RETURN 31
  ELSE
    RAISE(dates, 1, "no such month")
  END
END DaysIn;

The ELSE branch now handles only invalid months; the months with 31 days get a label of their own. The module allocates the exception source dates in its body.

raisetest.mod
MODULE raisetest;
FROM Tests IMPORT Check, CheckInt, Finish;
FROM Dates IMPORT DaysIn;

VAR
  days: CARDINAL;

PROCEDURE Raises(test: PROC): BOOLEAN;
BEGIN
  test;
  RETURN FALSE
EXCEPT
  RETURN TRUE
END Raises;

PROCEDURE MonthZero;
BEGIN
  days := DaysIn(0, 2024)
END MonthZero;

PROCEDURE Month13;
BEGIN
  days := DaysIn(13, 2024)
END Month13;

PROCEDURE May;
BEGIN
  days := DaysIn(5, 2024)
END May;

BEGIN
  Check("month 0 raises", Raises(MonthZero));
  Check("month 13 raises", Raises(Month13));
  Check("May does not raise", NOT Raises(May));
  CheckInt("May has 31 days", days, 31);
  Finish
END raisetest.

Raises takes a parameterless procedure of the standard type PROC, calls it and reports whether it raised an exception. If the call returns normally, Raises returns FALSE; if an exception leaves the call, the handler returns TRUE. Each case is a small procedure that stores its result in days, so the test also checks that a valid month still works.

$ gm2 -fiso -c Dates.mod
$ gm2 -fiso raisetest.mod Tests.o Dates.o -o raisetest
$ ./raisetest
4 passed, 0 failed

Running the tests with make

A project with several test programs needs one command that builds and runs them all. The compiling and debugging article builds a program with make; here a test target runs the tests as well.

Makefile
GM2 = gm2 -fiso -Wall
TESTS = datestest texttest numberstest raisetest

.PHONY: test clean
test: $(addprefix run-,$(TESTS))

run-%: %
	./$<

%test: %test.mod
	$(GM2) $< $(filter %.o,$^) -o $@

datestest: Dates.o
texttest: Tests.o Text.o
numberstest: Tests.o Numbers.o
raisetest: Tests.o Dates.o

%.o: %.mod %.def
	$(GM2) -c $<

clean:
	rm -f $(TESTS) *.o

test depends on one run- target per test program, and the pattern rule run-% builds the program and runs it. A test program is linked from its source and the object files listed in its dependency line; $(filter %.o,$^) picks them out of the prerequisites. make stops at the first command with a non-zero status, so the failing numberstest stops the run and raisetest is never built. make -k (keep going) runs the remaining targets and reports the failure at the end. In both cases make itself exits with status 2.

$ make test
gm2 -fiso -Wall -c Dates.mod
gm2 -fiso -Wall datestest.mod Dates.o -o datestest
./datestest
6 passed, 0 failed
gm2 -fiso -Wall -c Tests.mod
gm2 -fiso -Wall -c Text.mod
gm2 -fiso -Wall texttest.mod Tests.o Text.o -o texttest
./texttest
6 passed, 0 failed
gm2 -fiso -Wall -c Numbers.mod
gm2 -fiso -Wall numberstest.mod Tests.o Numbers.o -o numberstest
./numberstest
FAIL: -2147483648
12 passed, 1 failed
make: *** [Makefile:8: run-numberstest] Error 1
$ make -k test
./datestest
6 passed, 0 failed
./texttest
6 passed, 0 failed
./numberstest
FAIL: -2147483648
12 passed, 1 failed
make: *** [Makefile:8: run-numberstest] Error 1
gm2 -fiso -Wall raisetest.mod Tests.o Dates.o -o raisetest
./raisetest
4 passed, 0 failed
make: Target 'test' not remade because of errors.
$ echo $?
2

Source

The GNU Modula-2 manual

The GNU make manual

In this article we have written checks that count passes and failures, reported expected and actual values, set the exit status with HALT, fixed a bug that the tests found, moved the helpers into a Tests module, written table-driven tests, tested that a procedure raises an exception and run all tests with make. The error handling article covers the exceptions used here, and the modules article the separate compilation behind the test programs.

Author

I am Jan Bodnar, a programmer and technical writer. I have been writing programming tutorials at ZetCode since 2007 and have published eight e-books. See about the author.

List all Modula-2 tutorials.